From 1 - 3 / 3
  • The borehole information pack from borehole GGA07, site 03 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole and open hole wireline data, optical camera data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 24th June and 16th December 2019 (start of drilling to casing installation date) to 56.9 m drilled depth. The cased borehole was wireline logged in January 2020 and hydrogeologically tested in February 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528080 DOI https://dx.doi.org/10.5285/d8d27fb5-3be4-4a54-aef7-8429ec234667

  • The borehole information pack from borehole GGA05, site 02 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole and open hole wireline data, optical camera data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 1st July and 11th October 2019 (start of drilling to casing installation date) to 88.5 m drilled depth. The cased borehole was wireline logged and hydrogeologically tested in January 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528052 DOI https://dx.doi.org/10.5285/714fe9fc-ce77-4479-8053-1c5fd4e86f06

  • The borehole information pack from borehole GGA08, site 03 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole and open hole wireline data, optical camera, CCTV data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 25th June and 6th December 2019 (start of drilling to casing installation date) to 91.37 m drilled depth. The cased borehole was wireline logged in January 2020 and hydrogeologically tested in February 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528081 DOIhttps://dx.doi.org/10.5285/b19497aa-75a5-4f51-8089-299f9229b9ca